Location: |
|
BALD EAGLE STATE FOREST, MIFFLIN COUNTY, ARMAGH |
Work Includes: |
|
Work included under this contract consists of removing an existing steel girder bridge and replacing it with a prestressed concrete plank beam bridge with architectural surface treatment, rock lining, driving surface aggregate, and installation of guiderail.
Engineer's Estimate: $100,000 - $500,000
Bidders for this project shall as of the bid opening date, be listed as Pennsylvania Department of Transportation (PennDOT) prequalified, as a Prime Contractor, in Category S1. |