Location: |
|
Forest District 3, Tuscarora State Forest, PERRY COUNTY, TOBOYNE |
Work Includes: |
|
Work included under this contract consists of removing the existing culvert and replacing with aluminum structural plate arch with reinforced concrete footings and headwalls; architectural surface treatment, rock lining, placing selected material surfacing on roadway and installing guide rail. Small Business Certification Required. Bidders for this project shall as of the bid opening date, be listed as Pennsylvania Department of Transportation (PennDOT) prequalified, as a Prime Contractor, in Category S4. Engineer's Estimate: $100,000.00 - $500,000.00. |