Location: |
|
FOREST DISTRICT 13 - ELK STATE FOREST, MCKEAN COUNTY, SERGEANT |
Work Includes: |
|
Work included under this contract consists of all site work to suit project preparation, execution and completion. This includes demolition of existing steel girder bridge on Huffman Farm Road over Red Mill Brook (Bridge No. 13-0068). It will be replaced with a precast concrete rigid frame with an 18’-0” clear roadway width. Replacement at the structure will also include driving surface aggregate, rock lining, architectural surface treatment, and guiderail including end treatments. Bidders for this project shall as of the bid opening date, be listed as Pennsylvania Department of Transportation (PennDOT) prequalified, as a Prime Contractor, in Category S1. Engineer's Estimate:
$500,000 - $1 Million |