Bid Information
GENERAL INFORMATION
Project Number:   FDC-307-6115.3
Project Title:   Plumbing Construction Replace Maintenance Building
Location:   GREENWOOD FURNACE STATE PARK, HUNTINGDON COUNTY, JACKSON
Issue Date:   7/26/2017
Opening Date:   8/22/2017 ( 2:00 PM )
Work Includes:   Work included under this contract consists of the plumbing construction to replace the maintenance building at Greenwood Furnace State Park. Work includes plumbing systems including sanitary, waste, vent, hot water & cold water piping, specialties & equipment; complete water heating system including electric water heaters, piping, piping specialties; compressed air piping including supports, drain valves, couplings; oil water separator including piping and trench drains; plumbing fixtures, piping, specialties, and equipment; thermal insulation of equipment and piping; concrete pads for all floor-mounted equipment; cleaning of all equipment, piping, fixtures; testing, balancing, and adjusting; operating & maintenance instructions and manuals; demonstration of system operation; required assistance for commissioning agent’s work regarding plumbing systems; training of plumbing systems; training, operation, maintenance manuals; fixture rough-ins. Engineer's Estimate: $50,000 - $100,000
  Request Bid Package
Addenda:  
Addendum Date:  
PLAN HOLDER INFORMATION
Click on the name of the Plan Holder in the list below to view detailed information.