Bid Information
GENERAL INFORMATION
Project Number:   FDC-007-101733.1
Project Title:   Structure Replacement Cooper Mill Road Over Spruce Run
Location:   BALD EAGLE STATE FOREST, UNION COUNTY, LEWIS
Issue Date:   3/1/2017
Opening Date:   3/23/2017 ( 2:00 PM )
Work Includes:   Work included under this contract consists of all site work to suit project preparation, execution and completion. This includes demolition of existing structure Cooper Mill Road over Spruce Run (#59-7935-5107-0042). It will be replaced with a pre-stressed concrete spread box beam bridge with a 18’ clear roadway width. Replacement at the structure will also include driving surface aggregate, rock lining, architectural surface treatment, and guiderail including end treatments. Bidders for this project shall as of the bid opening date, be listed as Pennsylvania Department of Transportation (PennDOT) prequalified, as a Prime Contractor, in Category S1. The successful Bidder may be required to submit a copy of the PennDOT Prequalification Certificate. Engineer's Estimate: $100,000 - $500,000
  Request Bid Package
Addenda:   1
Addendum Date:   3/16/2017
PLAN HOLDER INFORMATION
Click on the name of the Plan Holder in the list below to view detailed information.